week 40 - wiring and lighting finished, solar panels installation

imgp8853
We decided that the north wall of the bedroom should be insulated and panelled with chestnut cladding.

We decided that the north wall of the bedroom should be insulated and panelled with chestnut cladding.
imgp8858
Margaret putting in the hemp semi rigid insulation.

Margaret putting in the hemp semi rigid insulation.
imgp8859
The weather improved and Claude and David carried the solar panels up onto the roof to install them in front of the roof lights.

The weather improved and Claude and David carried the solar panels up onto the roof to install them in front of the roof lights.
imgp8861
Claude Juan and David with the solar panels..

Claude Juan and David with the solar panels..
imgp8866
The Giordano solar heating control panel with cover off.

The Giordano solar heating control panel with cover off.
imgp8868
I had enclosed the double walled insulated and sealed flue of the Godin fire in a duct lined with Fermacell. A hole near the top (to be covered with a metal grille) extracts a considerable amount of hot air to the mezzanine, improving the output of the fire. Later I will install a small fan to bring the air down to the corridor behind the Godin.

I had enclosed the double walled insulated and sealed flue of the Godin fire in a duct lined with Fermacell. A hole near the top (to be covered with a metal grille) extracts a considerable amount of hot air to the mezzanine, improving the output of the fire. Later I will install a small fan to bring the air down to the corridor behind the Godin.
imgp8869
The heat extract ventilation unit in the roof space with a few of the insulated flexible ducts connected. The insulation has not yet benn finally placed around it.

The heat extract ventilation unit in the roof space with a few of the insulated flexible ducts connected. The insulation has not yet benn finally placed around it.
imgp8871
The bathroom nearly finished. The bath and duct will be chestnut panelled.

The bathroom nearly finished. The bath and duct will be chestnut panelled.
imgp8873
After the panelled insulated wall in the bedroom, here are the floor joists ready for the chestnut floor boarding (which will have loose hemp (chenevotte) insulation under it)

After the panelled insulated wall in the bedroom, here are the floor joists ready for the chestnut floor boarding (which will have loose hemp (chenevotte) insulation under it)
imgp8877
The small WC off the entrance lobby being plumbed in.

The small WC off the entrance lobby being plumbed in.
imgp8880
The basement shower room, laundry and WC.

The basement shower room, laundry and WC.
imgp8881
Basin in the the shower room (IKEA)

Basin in the the shower room (IKEA)
imgp8883
All the wiring and lighting was installed and temporary incandescent bulbs put in for testing. Final light fittings will all have low energy bulbs - many of them LEDS. Total power consumption of all lighting 400 watts !