HOME  »  BUILDING A SOLAR HOUSE IN FRANCE - WEEK 3 - foundations to slab »  Viewing imgp8239     [Image 2 of 19]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Pipes fixed ready for the bath, shower, WC's etc to go under the concrete slab. At this point at the end of the week, Faye's gang left. Francis Guinot asked me for detailed drawings of the external basement walls which were going to be in 'monomur' blocks (briques). These are 37,5 cm thick perforated fired clay bricks with 21 cavities which are load bearing and insulation in one. They slot together like 'Lego' with glued joints applied by roller, and the openings and angles of the walls have to be designed to the modules of the monomur.
Nov 30, 2006 - 09:47 AM

Next slide
 
Nov 30, 2006 - 09:48 AM
Dec 06, 2006 - 10:58 AM

Dec 06, 2006 - 11:09 AM

Dec 06, 2006 - 11:21 AM

Dec 06, 2006 - 11:22 AM

Dec 08, 2006 - 02:31 PM

Album last updated on Jan 02, 2007 - 06:17 PM
Powered by JAlbum 6.5 and BluPlusPlus skin