4: The triangular trusses which are on each side of the main central frame, stacked ready for delivery. There has been much discussion about how the frames should be assembled on site - Mr Mazieres is used to lifting them straight from the floor of his atelier onto a large lorry, but the assembled frames are too high and there are too many tight corners on the access road to the site to do that. My original suggestion about how to do each one in 3 sections was eventually accepted. Further bright ideas that I had, were strongly resisted, but I feel may be reconsidered when we get on site next week.