BUILDING A SOLAR HOUSE IN FRANCE - WEEK 11 - Roofing »  Viewing imgp9860     [Image 2 of 30]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Placing rafters on the south slope.
The last purlins being lowered with the 'Merlo' crane at full extension of 19 metres.

Next slide
 
imgp9860.jpg - 2560 x 1920 - (3.23MB)
Oct 22, 2007 - 12:53 PM
Rafters fixed to the south slope.  A lot of discussion about the roof projection at each end.

Just before lunch rafters had been fixed on the south roof slope.  I went off to collect sample of larch boarding from Mr Merle in La Coquille.

By 4 pm most of the rafters had been fixed and were being trimmed at the ends of the tie beams (entraits).

In the afternoon it began to cloud over, but good weather is forecast for tomorrow. I hope Mr Mazieres can get the ecran de toiture and battens on before it rains again.

On Tuesdy afternoon the roof tiles arrived. Mr Mazieres and his men could not come and I was working on site marking out floor joist positions and trying to decide whether fixing the joists was a job I could do to save money.  But the joists are so heavy that I decided to leave to him and his men.