Comment: View from the bottom of our wood. It has been very cold every morning (-6 degrees Celsius ttoday) but with very bright sunshine it quickly warms up, but the leaves are starting to fall. Mr Mazières is coming on Monday to finish most of his work on the main house.
On Thursday the framing was finished and covered with the breathable membrane (ecran respirante) and they started nailing on the mèlèze

Mr Mazières having a cigarette and thinking about the lapping of the boards.

Lifting a 15 x 10 cm cill member into place under the roof window / solar collector, over which the zinc flashing is fixed.

During the first day putting up the oak frame, the end truss was not checked carefully enough and was slightly out of postion and not quite vertical, and I did not see the error until all the other trusses were correctly in position and braced to it. I asked for it to be corrected and was told forcefully that it was too late !  The mistake is visible in this picture, but is not very serious as the truss is hidden in the thckness of the insulated wall in the gable end.

Fixing the larch boarding in place.

Soldering the zinc flashings around the roof light.

Late friday afternoon they had done nearly all the boarding on the gable and around the roof light.

I brought my new DeWalt radial bench saw to the site,  to cut larch cladding.