Week 15+ self-build from now on - Interior partitions and joinery »  Viewing imgp0140     [Image 1 of 8]  :: Jump To  
  You have reached the first slide You have reached the first slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: January 2008 - from now on progress is slower because I am on my own (with Margaret of course). The real 'self-build' begins now with all the interior partitions, ceilings, floors and joinery.
Next slide
 
imgp0140.jpg - Dec 30, 2007 - 03:20 PM
Geff came from Sheffield for a week to help with putting in ceilings and floors on the mezzanine.  They are in tongued and grooved Poplar, another local wood which does not need chemical treatment against insects or fungus. It is soft but very pale with hardly any knots.

Geffrey on the mezzanine cutting poplar floor boards for the spare bedroom. The weather was awful - continual rain but luckily not cold. The polythene temporary windows kept us dry. The rest of the windows are being made and should be fitted the first week in February.

View down from mezzanine of Margaret varnishing the inside of windows. Ceiling over Margaret's 'bureau' at the top of picture.

After work at about 5:00

A week later with more partition framing and doors to bedroom, bathroom and bureau hung. All the oak has marks and stains from water, boots, iron forks and every surface needs sanding. the cost and complications of sand-blasting has been rejected. Water is still getting in past my temporary polythene windows and staining the oak.

Album last updated on Mar 30, 2008 - 04:32 PM