BUILDING A SOLAR HOUSE IN FRANCE - Plastering with new machine - masons back on site. »  Viewing imgp0566     [Image 23 of 23]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      You have reached the last slide You have reached the last slide  

Albert about to give the machine its first cleanup.

Francis began to dig the hole for the septic tank (in this case a fosse toutes eaux which takes all soil and waste water).

The other gang from Faye began to build the foundation wall for the stone facing wall.

The cavity is filled with extruded polystyrene insulation (find me a waterproof ecological alternative)

You have reached the last slide
 
imgp0566.jpg - Apr 14, 2008 - 05:47 PM
Comment: A 3000 litre "fosse toutes eaux" was delivered on Monday afternoon, but I had to break the bad news that the regulations required one of 4000 litres so it had to be taken back the next morning.
Album last updated on Apr 26, 2008 - 09:59 PM