Building a solar House in France - plastering, stone wall, septic tank and sand filter »  Viewing imgp0647     [Image 32 of 36]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Next Monday morning Francis carried on digging a drain for the overflow from the 4000 lire rain water collection cistern. Again he struck rock and had to use the Komatsu pneumatic drill. All this rock cutting is costing 85 Euros an hour ! But this time it was only about 40 minutes.
By Friday afternoon the site around the house looked like a battlefield.

The ventilation of the fosse as required by Mme Berthome.

The guest bedroom was plastered on Friday afternoon,

The sous sol shower recess.

On Saturday morning Margaret came to inspect progress.

Next slide
 
Apr 21, 2008 - 05:55 PM
Laying the piping for the overflow and drain from the base of the retaining wall.

The septic tank and drain all covered with topsoil.

The overflow from the rain water tank.

The battlefield restored with topsoil on Tueday.  The sun returned and spring arrived.

Album last updated on Feb 02, 2009 - 04:23 PM
Powered by JAlbum 7.4 and BluPlusPlus skin