Building a solar House in France - partitions and sanding oak frame etc. »  Viewing imgp0890     [Image 14 of 14]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      You have reached the last slide You have reached the last slide  
Comment: In the sous sol, all the interior cills of the glazed doors have to have an insulating screed.
The insulation boards start to make the interior look more finished.

Living area looking towards the fire which will be flush with a wall made of heat storing blocks with tiling surround.

The connector for the underfloor heating pipes.

While the ground floor is cleared for action the workshop moves up to the mezzanine to finsih the 'fermacell' wall panels.

The kitchen ceiling nearly finished leaving the ceiling light slot.