Solar House In France - weeks 17 - 20 - interiors and electrical »  Viewing imgp0433     [Image 21 of 21]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      You have reached the last slide You have reached the last slide  
Comment: View of house from the south west at 6 at the end of March.
Another temporary landing on the mezzanine that I made quickly out of leftover poplar floor boards to make the access at the top of the temporary stair (echelle de meunier) safer.  Note the rolls of 17 layer multi reflective insulation that I am using in a few places where the depth is insufficient for 300 cm of hemp insulation, and where the reccommendation that the wall or roof must breathe  is not strictly required.

The roof has a series of leaks under the windows here when the wind blows a gale.

Partitions in the mezzanine, behind which is the roof space over the entrance and wc, which will be stuffed with hemp insulation.

The hemp semi rigid panels which are proving very difficult to cut.

The sous-sol atelier with the plasterers' scaffolding ready to start on Monday April 1st.

You have reached the last slide
 
Album last updated on Mar 30, 2008 - 03:35 PM