TurboCAD model of the timber construction which wasplanned to be completely prefabricated off site. Colours are schematic to denote different elements. The 'sous sol' is not shown. After receiving unacceptably high tenders for the timber structure to be prefabricated, we have modified the design to be built entirely traditionally. More about that later.