Later design drawing (2005)after the project had been postponed for a couple of years for reasons of finance. By that time we had had further thoughts and sited the house further down away from the road in a slight clearing in the middle of the woodland and on a steeper slope, allowing a larger "sous sol" or basement and cellar floor level with bigger studio and spare bedroom. In this position no mature trees had to be cut down. Square plan with minimum surface area and a vertical rooflight over the mezzanine level. Area of solar collectors increased.