The stone wall was topped off with a cut limestone coping
The stone wall was topped off with a cut limestone coping
|
Before the digger was collected, a load of stone for the base of the terrace was brought and placed.
Before the digger was collected, a load of stone for the base of the terrace was brought and placed.
|
Stone being spread on the small terrace outside the kitchen.
Stone being spread on the small terrace outside the kitchen.
|
Claude, the plumber, set up his workshop in the kitchen.
Claude, the plumber, set up his workshop in the kitchen.
|
The terrace outside the dining area, which will have the pergola an vine over it. Spare stone dumped in a heap to use later for the steps down.
The terrace outside the dining area, which will have the pergola an vine over it. Spare stone dumped in a heap to use later for the steps down.
|
The mezzanine parquet floor in oak - boards in 3 different widths.
The mezzanine parquet floor in oak - boards in 3 different widths.
|
Mezzanine with temporary handrail.
Mezzanine with temporary handrail.
|
Michel and Claude working on the 1000 litre heating system water storage tank.
Michel and Claude working on the 1000 litre heating system water storage tank.
|
Garage walls being finsihed offready for the roofer next week.
Garage walls being finsihed offready for the roofer next week.
|
|
Mezzanine with radiator installed, ready to test the heating.
Mezzanine with radiator installed, ready to test the heating.
|