week 35 - garage walls finshed, plumbers and electricians on site

imgp8619
The stone wall was topped off with a cut limestone coping

The stone wall was topped off with a cut limestone coping
imgp8624
Before the digger was collected, a load of stone for the base of the terrace was brought and placed.

Before the digger was collected, a load of stone for the base of the terrace was brought and placed.
imgp8629
Stone being spread on the small terrace outside the kitchen.

Stone being spread on the small terrace outside the kitchen.
imgp8632
Claude, the plumber, set up his workshop in the kitchen.

Claude, the plumber, set up his workshop in the kitchen.
imgp8633
The terrace outside the dining area, which will have the pergola an vine over it. Spare stone dumped in a heap to use later for the steps down.

The terrace outside the dining area, which will have the pergola an vine over it. Spare stone dumped in a heap to use later for the steps down.
imgp8652
The mezzanine parquet floor in oak - boards in 3 different widths.

The mezzanine parquet floor in oak - boards in 3 different widths.
imgp8658
Mezzanine with temporary handrail.

Mezzanine with temporary handrail.
imgp8699
Michel and Claude working on the 1000 litre heating system water storage tank.

Michel and Claude working on the 1000 litre heating system water storage tank.
imgp8618
Garage walls being finsihed offready for the roofer next week.

Garage walls being finsihed offready for the roofer next week.
imgp8630
imgp8660
Mezzanine with radiator installed, ready to test the heating.

Mezzanine with radiator installed, ready to test the heating.