Week 61 : More joinery, painting and internal work. exteriors finished.

imgp9480
M painting the cupboard in the mezzanine bedroom.

M painting the cupboard in the mezzanine bedroom.
imgp9386
The cupboard doors I made from chestnut tongued and grooved boarding....

The cupboard doors I made from chestnut tongued and grooved boarding....
imgp9479
... as was the bedroom door - here mortised for the latch.

... as was the bedroom door - here mortised for the latch.
imgp9486
The oak floor on the mezzanine was varnished with an ecological water based product.

The oak floor on the mezzanine was varnished with an ecological water based product.
imgp9388
Outside, I had to clean the lime from the crépis off the boarding and beams before the scaffolding was taken down.

Outside, I had to clean the lime from the crépis off the boarding and beams before the scaffolding was taken down.
imgp9483
View of finished exterior from the East...

View of finished exterior from the East...
imgp9490
...from the West,...

...from the West,...
imgp9488
...from the South...

...from the South...
imgp9491
...South again. The rain water pipe is temporary until I build the filtration basins to catch the rain water and pipe it to the cistern below the terrace.

...South again. The rain water pipe is temporary until I build the filtration basins to catch the rain water and pipe it to the cistern below the terrace.
imgp9420
The garage and 'auvent' from the South West...

The garage and 'auvent' from the South West...
imgp9421
...and garage from the South.

...and garage from the South.