M painting the cupboard in the mezzanine bedroom.
M painting the cupboard in the mezzanine bedroom.
|
The cupboard doors I made from chestnut tongued and grooved boarding....
The cupboard doors I made from chestnut tongued and grooved boarding....
|
... as was the bedroom door - here mortised for the latch.
... as was the bedroom door - here mortised for the latch.
|
The oak floor on the mezzanine was varnished with an ecological water based product.
The oak floor on the mezzanine was varnished with an ecological water based product.
|
Outside, I had to clean the lime from the crépis off the boarding and beams before the scaffolding was taken down.
Outside, I had to clean the lime from the crépis off the boarding and beams before the scaffolding was taken down.
|
View of finished exterior from the East...
View of finished exterior from the East...
|
...from the West,...
...from the West,...
|
...from the South...
...from the South...
|
...South again. The rain water pipe is temporary until I build the filtration basins to catch the rain water and pipe it to the cistern below the terrace.
...South again. The rain water pipe is temporary until I build the filtration basins to catch the rain water and pipe it to the cistern below the terrace.
|
The garage and 'auvent' from the South West...
The garage and 'auvent' from the South West...
|
...and garage from the South.
...and garage from the South.
|