Week 62 : Internal mezzanine joinery and finishings

imgp9485
The new chestnut doors in the mezzanine bedroom - floor varnished...

The new chestnut doors in the mezzanine bedroom - floor varnished...
imgp9642
...door varnished and handle fitted....

...door varnished and handle fitted....
imgp9639
...window reveals and cill finished...

...window reveals and cill finished...
imgp9635
...and mezzanine floor oiled and varnished....

...and mezzanine floor oiled and varnished....
imgp9643
...and viewed from the window.

...and viewed from the window.
imgp9652
Grille fitted to the vent extracting warm air from the flue duct.

Grille fitted to the vent extracting warm air from the flue duct.
imgp9638
Door into roofspace containing the VMC unit (heat recovery ventilation) and opening for glazing over kitchen...

Door into roofspace containing the VMC unit (heat recovery ventilation) and opening for glazing over kitchen...
imgp9633
....seen from below.

....seen from below.
imgp9630
A small area of poplar ceiling hiding the duct from the kitchen extract unit.

A small area of poplar ceiling hiding the duct from the kitchen extract unit.
imgp9632
Electric oven awaiting the unit in which it will be enclosed.

Electric oven awaiting the unit in which it will be enclosed.
imgp9649
Inspection by daughter and grandchildren...

Inspection by daughter and grandchildren...
imgp9645
Our 24 year old Renault van in which we collect materials and things (total saving in delivery charges so far = 3500 Euros )

Our 24 year old Renault van in which we collect materials and things (total saving in delivery charges so far = 3500 Euros )