Week 63 : mezzanine finished

imgp9688
The final thing to do on the mezzanine - the frame and glazing in laminated glass over the kitchen...

The final thing to do on the mezzanine - the frame and glazing in laminated glass over the kitchen...
imgp9730
...here with the afternoon sun shining through the rooflights...

...here with the afternoon sun shining through the rooflights...
imgp9726
...seen from below showing the contribution to the light in the kitchen...

...seen from below showing the contribution to the light in the kitchen...
imgp9671
...and with the lights on as well.

...and with the lights on as well.
imgp9674
Margaret making a start on staining the beams in the main bedroom.

Margaret making a start on staining the beams in the main bedroom.
imgp9679
The floor tiler arrived to lay the tiles in the 'auvent' link.

The floor tiler arrived to lay the tiles in the 'auvent' link.
imgp9672
I made formwork for the step up into the greenhouse, for the tiler to fill with his screed mix....

I made formwork for the step up into the greenhouse, for the tiler to fill with his screed mix....
imgp9681
...the next day.

...the next day.
imgp9684
He laid the screed and tiled in one operation and then tiled the steps when the shuttering had been removed.

He laid the screed and tiled in one operation and then tiled the steps when the shuttering had been removed.
imgp9715
The shuttering will be modified and reused for the steps down from the garage.

The shuttering will be modified and reused for the steps down from the garage.
imgp9700
All the 'auvent' needs now to be finished is the tongued and grooved boarding on the ceiling .

All the 'auvent' needs now to be finished is the tongued and grooved boarding on the ceiling .