Week 71-75 : ground floor, kitchen, rain water collection.

imgp9833
By the beginning of November the leaves started turning yellow and falling.

By the beginning of November the leaves started turning yellow and falling.
imgp9834
The sun was lower and days shorter.

The sun was lower and days shorter.
imgp9835
Bath and duct panels finished.

Bath and duct panels finished.
imgp9837
The oven in its housing ready to be wired in...

The oven in its housing ready to be wired in...
imgp9836
...on the box that gives headroom over the stair down to the basement.

...on the box that gives headroom over the stair down to the basement.
imgp9838
I spend days in the roofspace looking for gaps in the envelope and insulation and sealing them with 'breather' membrane to eliminate unwanted air infiltration.

I spend days in the roofspace looking for gaps in the envelope and insulation and sealing them with 'breather' membrane to eliminate unwanted air infiltration.
imgp9842
The solid birch doors from Leroy Merlin, here needed solid panels fixing ..

The solid birch doors from Leroy Merlin, here needed solid panels fixing ..
imgp9844
...and translucent toughened glass glazing, here to the bedroom and bathroom area.

...and translucent toughened glass glazing, here to the bedroom and bathroom area.
imgp9957
....here viewed open towards the shower.

....here viewed open towards the shower.
imgp9845
The weather turned chilly and using the fire provoked a change in design of the 'hearth'.....

The weather turned chilly and using the fire provoked a change in design of the 'hearth'.....
imgp9852
...and we decided to have a tiled shelf just underneath it . I made a welded steel angle frame, here shown as a mockup to work out the height. It will have wood storage underneath

...and we decided to have a tiled shelf just underneath it . I made a welded steel angle frame, here shown as a mockup to work out the height. It will have wood storage underneath
imgp9847
The interior of the shower and soap recess was painted with special waterproofing compound under the tiling.

The interior of the shower and soap recess was painted with special waterproofing compound under the tiling.
imgp9849
The kitchen was plumbed in and we moved in to have tea and lunch.

The kitchen was plumbed in and we moved in to have tea and lunch.
imgp9854
The rains started after a long dry Autumn, and the time had come to fill the rain water cistern. I had to find the manhole to put in a filter.

The rains started after a long dry Autumn, and the time had come to fill the rain water cistern. I had to find the manhole to put in a filter.
imgp9871
A home made filter with acacia rot proof frame which I hope will last. It is reputed to outlast teak.

A home made filter with acacia rot proof frame which I hope will last. It is reputed to outlast teak.
imgp9856
The receiver from the gutters (via a chain) custom made from large heavy plastic basin, cut down to size....

The receiver from the gutters (via a chain) custom made from large heavy plastic basin, cut down to size....
imgp9865
.. connected to drains cast into slab under 'auvent'

.. connected to drains cast into slab under 'auvent'
imgp9875
Galvanised chain suspended from gutter outlet...

Galvanised chain suspended from gutter outlet...
imgp9898
.. with an additional filter on it to exclude leaves.

.. with an additional filter on it to exclude leaves.
imgp9881
Kitchen fittings fitted with skirtings....

Kitchen fittings fitted with skirtings....
imgp9960
...and oak thresholds at the door between the changes of tiles.

...and oak thresholds at the door between the changes of tiles.
imgp9903
The search continued for points where air infiltration could happen around wall panelling and skirtings.

The search continued for points where air infiltration could happen around wall panelling and skirtings.
imgp9958
Another weak point is around the chestnut filling between the beams in bedroom and study.

Another weak point is around the chestnut filling between the beams in bedroom and study.
imgp9908
At this point I decided to move my 'workshop' downstairs to the basement ...

At this point I decided to move my 'workshop' downstairs to the basement ...
imgp9971
... into the room that will be my printmaking studio.

... into the room that will be my printmaking studio.
imgp9895
Nearly 3 years after the larch cladding on the western gable was done and treated with 2 coats of linseed oil....

Nearly 3 years after the larch cladding on the western gable was done and treated with 2 coats of linseed oil....
imgp9945
...it still looks OK - partly because of the roof overhang.

...it still looks OK - partly because of the roof overhang.