Building a solar House in France - self build - invisible work »  Viewing imgp0802     [Image 1 of 16]  :: Jump To  
  You have reached the first slide You have reached the first slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: Before the installation of the stove I built a base to raise it off floor level with 'Siporex' blocks and a concrete slab.
Next slide
 
Jun 11, 2008 - 04:12 PM
Although we have an old concrete mixer, I thought so little concrete was needed for the little slab that I mixed it in a barrow.  It was a mistake.

The next chore was to prepare for the fixing of the flue passing through the roof, which I had to do.  A heavy glavanised collar had to be screwed precisely vetically under the flashing already through the tiles that had already caused so much trouble.

Much of the work I do is invisible - like partitions in the larder and small fixings and fiddly fittings where they are not seen,  giving observers the impression that I'm not doing anything.

The wood fire base with shuttering still on.

Working on the roof is not my favouite occupation, but I had some help - one person below and two above were needed to fix the chimney.

Album last updated on Jul 16, 2008 - 11:29 PM
Powered by JAlbum 6.5 and BluPlusPlus skin