Solar House In France - weeks 17 - 20 - interiors and electrical
»
Viewing
imgp0408
[Image 11 of 21]
::
Jump To
- Page 1
Comment:
I have made a temporary landing at the top of the stairs down to the sous sol using leftover and reject poplar floor boards, and plan to make a temporary stair soon to make movement between floors easier and safer.
Album last updated on Mar 30, 2008 - 03:35 PM
Powered by
JAlbum 6.5
and
BluPlusPlus
skin