Building a solar House in France - plastering, stone wall, septic tank and sand filter »  Viewing imgp0653     [Image 34 of 36]  :: Jump To  
  First slide Previous slide      Index Page Start/Stop the slide show      Next slide Last slide  
Comment: The septic tank and drain all covered with topsoil.
The guest bedroom was plastered on Friday afternoon,

The sous sol shower recess.

On Saturday morning Margaret came to inspect progress.

Next Monday morning Francis carried on digging a drain for the overflow from the 4000 lire rain water collection cistern. Again he struck rock and had to use the Komatsu pneumatic drill. All this rock cutting is costing 85 Euros an hour !  But this time it was only about 40 minutes.

Laying the piping for the overflow and drain from the base of the retaining wall.

Next slide
 
Apr 22, 2008 - 10:12 AM
The overflow from the rain water tank.

The battlefield restored with topsoil on Tueday.  The sun returned and spring arrived.

Album last updated on Feb 02, 2009 - 04:23 PM